Power For AI Factories And Data Centers

AI compute is growing faster than the grid can serve it. Speed to power is the constraint, and it is the one BPi solves. BPi constructs the AI factory as general contractor: site works, structure, envelope, power and switchgear self-performed, with liquid-cooled halls, cooling and GPU compute delivered in partnership with specialist manufacturers, one accountable EPC from the source to the rack.

Since 2008
Licensed EPC, nationwide delivery
$226M+
In energy and generation projects delivered
94.5 MW
Installed capacity to date
EMR 0.71
2026 experience modification rate. Below 1.0 means a safety record better than average, and discounted insurance premiums.

A Data Center Is A Power Problem

Solar and energy storage
BPi self-performs

Solar Generation

Rooftop, carport and ground-mount PV, engineered, procured and built in house.

BPi self-performs

UPS and Battery Energy Storage

Commercial and industrial scale BESS that firms supply, shaves peak demand and rides through utility events.

BPi self-performs

Switchgear, Controls And Interconnection

Medium-voltage distribution scoped per project, protection, microgrid controls, and utility applications through permission to operate.

Specified and integrated by BPi

On-Site Generation

Prime and standby generation on mtu gas and diesel platforms from Rolls-Royce, Cummins, Generac, and other top-tier Power Systems, with switchgear, controls and lifecycle support delivered as one BPi scope. Hydrogen-ready configurations where the site case supports them.

BPi self-performs

Generation Monitoring

Real-time visibility into on-site generation, storage and load after handover, with exception management and owner reporting.

BPI BUILDS THE SHELL, PARTNERS FIT IT OUT

Halls, Cooling And Compute

Roofing and building envelope through OneRoof Solution. Liquid-cooled halls, rack-ready fit-out and GPU clusters delivered with specialist compute and cooling partners under the same BPi contract.

Integrated Source-To-Rack Energy Architecture

Reliable. Resilient. Built for AI.

One accountable partner. Complete power solution.

Utility grid
High-voltage transmission
Reliable power from the grid
Substation
Step-down transformation
Protection and metering
On-site power sources
Solar and backup generation
Clean on-site generation, resilient backup power
Battery energy storage
Energy shifting and peak shaving
Backup power and grid support
MV distribution
Switchgear and distribution
Reliable power delivery
Cooling infrastructure
High-efficiency cooling
Optimized for AI workloads
AI data hall
High-density compute
Powering the next generation of intelligence

Reliable by design

N+1 redundancy, resilient architecture and rigorous testing support continuous uptime.

Faster to power

Integrated execution shortens timelines and accelerates time to energization.

Cost optimized

A hybrid energy strategy reduces operating costs and protects against grid volatility.

Sustainable future

Clean energy, battery storage and efficiency drive lower emissions and ESG outcomes.

One accountable partner

From source to rack, BPi delivers a complete solution with a single point of accountability.

BPi
Power for what's next
Strategy & feasibility→ Engineering & design→ Procurement→ Construction & integration→ Commissioning & testing→ Operations & support
Source to rack. Powering AI factories and data centers.
Inside the data hall

We Construct The Data Center

Not only the power behind it. BPi carries the licensing and the self-performed trades to take responsibility for the build itself, and brings in specialist partners for the parts of an AI factory that no single contractor should pretend to own.

BPi as general contractor

Site And Structure

Grading, foundations, structure and building envelope, with roofing through OneRoof Solution. Permits, inspections and closeout under one contract.

BPi self-performs

Power And Electrical

Generation, storage, medium-voltage distribution, switchgear, protection and the utility interconnection: the part of the build that sets the schedule.

In partnership, BPi as EPC

Halls, Cooling And Compute

Liquid-cooled data halls, rack-ready fit-out, cooling plant and GPU clusters delivered with specialist manufacturers and integrators, coordinated and warranted through BPi.

One Contractor For The AI Factory, Source To Rack

BPi develops and delivers the whole facility: power and envelope self-performed, halls, cooling and compute with specialist partners under one EPC contract. You bring the site and the load; you operate the compute. No coordination gap between the people who power it, the people who build it and the people who run it.

BPi scopeDevelops, powers and builds

  • Renewable, battery storage and behind-the-meter or islanded power options
  • On-site generation on mtu platforms from Rolls-Royce Power Systems, integrated and delivered by BPi
  • Switchgear, controls, protection and utility interconnection
  • Roofing and building envelope, self-performed
  • Liquid-cooled halls, rack-ready fit-out and GPU clusters, with specialist partners under BPi as EPC
  • Full-scope engineering, procurement and construction under one contract

Your scopeOwns and operates

  • Site, land and utility position, or let BPi assess candidates
  • Load profile, compute requirements and timeline
  • IT operations once the halls are commissioned
  • Uptime commitments to your end customers

Grid Queues Are The Bottleneck. We Work Around Them

On-site generation and storage let a site energise while the utility queue runs in parallel, and BPi owns the interconnection itself rather than leaving the project to wait.

On-site generation beside the data halls

Speed To Power

Firm power on site in as little as six months from notice to proceed. Go live on your schedule, not the utility's. On-site power carries the load while the interconnection application works through the queue.

Reliability

Resilience and redundancy built in, with power systems designed to support Uptime Institute Tier III requirements or higher.

Scale

Nationwide delivery, licensed in every state we build in, from a single site to a portfolio.

Sustainability

Solar, storage and hydrogen-ready mtu generation built into the strategy, not bolted on later.

How A Project Runs

One team from the first site walk to the monthly performance report. The same sequence on every site, adjusted to the contract.

  1. 1

    Assess

    Candidate sites, utility service, gas access, load profile, land and roof.

  2. 2

    Design

    Integrated solution and a preliminary business case you can take to a board.

  3. 3

    Permit

    Entitlements, AHJ permits, utility applications and interconnection.

  4. 4

    Build

    Power, distribution and supporting infrastructure under one EPC contract.

  5. 5

    Operate

    Monitoring, exception management, maintenance and owner reporting.

  6. 6

    Expand

    Repeat the validated design across the portfolio.

You See The Project The Way We Run It

Every BPi project runs on Setpoint, a project-delivery platform built for EPC firms. Your team gets a client portal into the same system our engineers and superintendents work in, not a status email once a fortnight.

Deliverables

Every drawing, submittal, permit and commissioning record tracked to a named owner and a date, visible to you as it moves.

Schedule

One integrated schedule from site assessment to permission to operate. Slips show up as forecasts, not surprises.

Earned Value

Cost and progress measured against the baseline every week, so a change in the number is a decision, not a discovery at closeout.

Reports That Write Themselves

AI-generated progress and risk reports from live project data, on a cadence you set, in a form your board can read.

Licensed, Registered, Insured

The qualifications a procurement team asks for first. Certificates and evidence available on request.

CSLB #930054

A General Engineering, C-10 Electrical, C-39 Roofing: the classifications that allow BPi to engineer and construct powerplants.

DIR PW-LR-1001181754

Public-works registered, certified payroll produced through Miter.

EMR 0.71

2026 experience modification rate. Below 1.0 means a safety record better than the industry average, and discounted insurance premiums.

Bonded And Insured

General liability, umbrella and bonding capacity. Certificates on request.

Power for what's next

One Contractor, Nationwide

Bright Power, Inc., trading as BPi, has delivered energy infrastructure since 2008. Data center and AI factory power is delivered across all 50 states, under one BPi contract and one point of accountability, wherever the site is.

50 states
Since 2008
One contract
One point of accountability

Microgrid Case Study

The same architecture an AI factory needs, already built and running: on-site generation, storage and demand management delivered as one system under a single contract.

Alpha Omega Winery · Rutherford, Napa Valley, CA

Largest Commercial Microgrid In PG&E's Service Territory At Completion

Solar generation, battery energy storage and demand management engineered, procured and built as one integrated system, with BPi as both EPC and general contractor. The site runs through utility events and shapes its own load rather than paying for the peaks.

640,500 kWhProduced on site each year
$15k to $1kMonthly utility bill, before and after
~93%Reduction in monthly utility cost
One contractEPC and general contractor, single point of accountability
  • Solar generation sized against measured site load, not nameplate assumptions
  • Battery energy storage for peak shaving and ride-through during utility events
  • Demand management and controls integrating generation, storage and load
  • Interconnection carried by BPi through permission to operate
  • Monitoring and owner reporting after handover

The economics of the project made as much sense as the environmental case.

Robin Baggett, Proprietor, Alpha Omega Vineyards
Photo: Bob McClenahan

Questions Buyers Ask First

Straight answers on power, timelines and scope. If yours is not here, bring it to a power strategy session.

How fast can we have firm power on site?

In as little as six months from notice to proceed, depending on site conditions, equipment lead times and permitting. On-site generation and storage carry the load while the utility interconnection application runs in parallel, so the compute deployment date is set by your build rather than by the utility queue.

What is behind-the-meter power, and why does it matter for AI?

Behind-the-meter means generation and storage sited on your property, on your side of the utility meter. It matters because interconnection queues now run years in many markets while an AI facility can be built in months. Behind-the-meter power closes that gap, and in an islanded configuration a site can run independently of the grid entirely.

How much power does an AI data center actually need?

Far more per square foot than a traditional facility. Liquid-cooled AI racks can draw several hundred kilowatts each, where a conventional rack draws five to ten. Sizing has to be done against peak draw and ramp behaviour rather than average load, because AI training workloads swing hard and fast. That load profile is what drives the generation, storage and switchgear design.

What does BPi self-perform, and what comes through partners?

BPi self-performs the power side: solar generation, battery energy storage, switchgear, controls, protection and the utility interconnection, plus roofing and building envelope. Liquid-cooled halls, cooling plant and GPU clusters are delivered with specialist manufacturers and integrators, coordinated and warranted through BPi under the same contract.

Can BPi work outside California?

Yes. Delivery is nationwide across all 50 states, licensed in every state we build in, under one BPi contract and one point of accountability.

What fuels and generation types are available?

Solar, battery energy storage, and on-site generation on natural gas and diesel platforms, with hydrogen-ready configurations where the site case supports them. Most projects end up hybrid: renewables and storage for cost and emissions, firm generation for continuity, and controls tying the two together.

How is redundancy handled?

Redundancy is designed to the uptime commitment you carry, including N+1 configurations, with power systems designed to support Uptime Institute Tier III requirements or higher. Firming, peak shaving and backup generation are sized to a facility that cannot go dark.

What happens on a power strategy session?

A working call with our engineers, not a sales pitch. We go through your project in detail: the site and its utility position, the load profile and ramp behaviour, your timeline and the date compute has to be live, and what the grid can realistically deliver by then. From that we talk through the options on the table, generation mix, storage, islanded or behind-the-meter, and what each one means for your schedule and your budget. You leave with a clear view of what the site can support and what it would take to get there. Bring your constraints, the harder the better.

Tell Us About Your Site, Load Profile And Timeline

We come back with the generation strategy: what the site can support, what it would take to get there, and how it runs while the utility queue catches up.

Schedule A Power Strategy Session
BPi, Bright Power Inc sales@bpi-power.com
Direct (707) 252-9990
Toll free (866) 214-9304

Head office Bright Power, Inc.
860 Napa Valley Corporate Way, Suite R
Napa, CA 94558