New California Metering Regulation - NEM 3.0, Cuts Solar Savings by 75% utility customers of PG&E, SCE, and SDG&E.

California’s solar savings are about to end

NEM 3.0 cuts solar energy credited by 75%

The Utilities Commission (CPUC) drastically cut the energy savings for any new solar installed with NEM 3.0. This drops the amount of solar energy credited by 75%. Utility customers of PG&E, SDG&E, and SCE need to submit an interconnection application as soon as possible to get grandfathered into current NEM 2.0 rates. BPi will guide you through the process.

Get Grandfathered Into NEM 2.0 For Maximum Solar Savings

Contact us today!

NEM 3.0 FAQs

When is the deadline to get grandfathered into NEM 2.0?

Interconnection applications need to be submitted as soon as possible to get locked-in to NEM 2.0 which means well before February 28th, 2023. The scheduled date NEM 3.0 to be in full effect is April 15, 2023.

What utility service areas will be impacted?

How does NEM 3.0 affect your property?

Who gets affected by NEM 3.0?

Contact us today to maximize your savings.